Research Projects

# Research Project Source
1. Organization and Development of Executive Construction Management Program (Exec 21) at Polytechnic University, Jan 1997 – August 1998, (M. Hastak, I. Juran, E. Fasulo, Co-PIs). Paul Soros Investment, Inc., New York,
2. Preventive Maintenance Management System for New York City Bridges: An Update, Jan 1998 – December 1998, (H. Ali, M. Hastak, M. Iskander, Co-PIs, Polytechnic Univ), Rimas Vaicaitis (PI), and F. H. (Bud) Griffis (Co-PI), Columbia University). Project handed over to Dr. Iskander before leaving Polytechnic in Aug. 1998. The Mayor’s Office of Construction, City of New York
3. Development of an ITS Cost Analysis Framework for Evaluating Program and Project Level Costs and Practices, June 1998 – August 1998, (Co-PI Polytechnic University; Falcocchio (Co-PI), Polytechnic University; Jean-Claude Thill, PI, U. of Buffalo). Project handed over to Dr. Falcocchio before leaving Polytechnic in Aug. 1998). NYS-DOT and Transportation Infrastructure Research Consortium (TIRC)
4. Electronic Simulation in Construction, Sept. 1998 - Jan. 2002, (M. Hastak, PI). Construction Industry Institute
5. NCHRP 12-53/Connection Between Simple-Span Precast Concrete Girders Made Continuous, July 1999 – Dec 2002, (R. Miller, PI; M. Hastak, A. Mirmiran, and B. Shahrooz, Co-PIs – University of Cincinnati). NCHRP
6. The Evaluation of Warranty Provisions on ODOT Construction Projects, Nov 2000 – December 2003, (M. Hastak, PI and Issam Minkarah, Co-PI). ODOT
7. Modeling of Manufactured Housing Production and Material Utilization, July 2000 – June 2003, (M. Hastak, Co-PI and Matt Syal, MSU, PI). NSF
8. Manufactured Housing Production Process Planning and Facility Design, Sept 2002 – Aug 2005 (M. Hastak, PI; Matt Syal, MSU, Co-PI). NSF
9. NCHRP 20-58(1)/Detailed Planning for Research on Accelerating the Renewal of America’s Highways, April 2002 – March 2003, National Cooperative Highway Research Program (NCHRP) (Lead Institution: Iowa State University; Purdue Team: Jan Olek, Becky McDaniel, M. Hastak, T. Pellinen, J Weiss, and A. Bobet). NCHRP
10. Constructability, Maintainability, and Operability of FRP Bridge Deck Panels, Nov 2002 – October 2004, (M. Hastak, PI and D.W. Halpin, Co-PI). JTRP
11. Achieving Radical Reduction in Project Cycle Time, March 2002 – December 2004, (M. Hastak, PI, Sanjiv Gokhale, Vanderbilt Co-PI). Construction Industry Institute
12. Housing Research Agenda Workshop, Aug 2003 – July 2004 (M. Hastak, Co-PI; Mike Mullins, UCF, Co-PI, Matt Syal, MSU, PI). NSF
13. Cost Schedule Tradeoff, March 2004 – December 2006, (M. Hastak, PI, Sanjiv Gokhale, Vanderbilt Co-PI). Construction Industry Institute
14. US-India Joint Workshop on Urban Housing and Supporting Infrastructure, Aug 2005 – July 2006, (M. Hastak, Co-PI; Mike Mullins, UCF, Co-PI, Matt Syal, MSU, PI ). NSF
15. Acquisition and Analysis of Earthwork Pay Quantity Verification Data, Nov 2006 – Feb 2008, (M. Hastak, PI). JTRP
16. Maximizing the Value of Construction in Pre-Project Planning, October 2006 – Dec 2008, (M. Hastak, Co-PI, Sanjiv Gokhale, Vanderbilt PI). Construction Industry Institute
17. Short Term Investigation of 2008 Midwest Floods, Sept 2008 – Feb 2009 (M. Hastak, PI and Eric Dietz Co-PI). NSF
18. Secretarial Support For the Journal of Management in Engineering, Annual Recurring Fund since 2009, (M. Hastak, PI). ASCE
19. Quantify the Benefits of Pavement Preservation, Jan 2010 – Apr 2011, (M. Hastak, PI). JTRP
20. Comparing Stabilized/Unstabilized Subbase for Unsealed Joints in PCCP – SPR 3510, Jan 2011 – Dec 2013 (extended until 2016), Joint Transportation Research Program (JTRP), (M. Hastak, PI and Yigong Ji, INDOT, Co-PI). JTRP
21. Performance Evaluation of Crack Sealing and Filling Materials with Pavement Preservation Treatments, SPR 3533, Jan 2011 – Dec 2014, Joint Transportation Research Program (JTRP), (M. Hastak, PI and Jusang Lee, INDOT, Co-PI). JTRP
22. Project Evaluation Methods For Pavement Preservation Treatments, Jan 2011 – April 2013, Joint Transportation Research Program (JTRP), (M. Hastak, PI and Jusang Lee, INDOT, Co-PI). JTRP
23. Mitigating Threats of Counterfeit Materials in the Capital Projects (RT307), Sept 2012 – August 2014, Construction Industry Institute (CII), (M. Hastak, PI, Sanjiv Gokhale, Vanderbilt Co-PI, Mehmet Emre Bayraktar, Florida International University Co-PI). Construction Industry Institute
24. Enhanced Treatment Selection for Reflective Joint Cracking in Composite Pavements (PHASE-1) – SPR 3626, Jan 2012 – Apr 2013, Joint Transportation Research Program ( JTRP),(M. Hastak, PI). JTRP
25. Enhanced Treatment Selection for Reflective Joint Cracking in Composite Pavements (PHASE-2) – SPR 3626, Jan 2013 – Apr 2014, Extension granted for May 2014 – Apr 2015 (M. Hastak, PI). JTRP
26. Intelligent Compaction of Asphalt Pavement Implementation – SPR 3804, Oct 2013 – Feb 2015, (M. Hastak, PI). JTRP
27. Towards a Resilient Electric Power Grid: An Investment Prioritization Decision Framework Integrating Risks of Severe Weather-Induced Outages (M. Hastak, PI). NSF