1. Enhanced Treatment Selection for Reflective Joint Cracking in Composite Pavements, Jan 2012 – Apr 2013, (M. Hastak, PI). |
JTRP |
2. Performance Evaluation of Crack Sealing and Filling Materials with Pavement Preservation Treatments, Jan 2011 – Dec 2013, (M. Hastak, PI and Jusang Lee, INDOT, Co-PI). |
JTRP |
3. Project Evaluation Methods For Pavement Preservation Treatments, Jan 2011 – Dec 2012, (M. Hastak, PI and Jusang Lee, INDOT, Co-PI). |
JTRP |
4. Quantify the Benefits of Pavement Preservation, Jan 2010 – Apr 2011, (M. Hastak, PI). |
JTRP |
5. Secretarial Support For the Journal of Management in Engineering, Annual Recurring Fund since 2009, (M. Hastak, PI). |
ASCE |
6. Short Term Investigation of 2008 Midwest Floods, Sept 2008 – Feb 2009
(M. Hastak, PI and Eric Dietz Co-PI)
|
NSF |
7. Maximizing the Value of Construction in Pre-Project Planning, October 2006 – Dec 2008, (M. Hastak, Co-PI, Sanjiv Gokhale, Vanderbilt PI). |
Construction Industry Institute |
8. Acquisition and Analysis of Earthwork Pay Quantity Verification Data, Nov 2006 – Feb 2008, (M. Hastak, PI). |
JTRP |
9. US-India Joint Workshop on Urban Housing and Supporting Infrastructure,
Aug 2005 – July 2006, (M. Hastak, Co-PI; Mike Mullins, UCF, Co-PI, Matt Syal, MSU, PI )
|
NSF |
10. Cost Schedule Tradeoff, March 2004 – December 2006,
(M. Hastak, PI, Sanjiv Gokhale, Vanderbilt Co-PI).
|
Construction Industry Institute |
11. Housing Research Agenda Workshop, Aug 2003 – July 2004
(M. Hastak, Co-PI; Mike Mullins, UCF, Co-PI, Matt Syal, MSU, PI).
|
NSF |
12. Achieving Radical Reduction in Project Cycle Time, March 2002 – December 2004,
(M. Hastak, PI, Sanjiv Gokhale, Vanderbilt Co-PI).
|
Construction Industry Institute |
13. Constructability, Maintainability, and Operability of FRP Bridge Deck Panels,
Nov 2002 – October 2004, (M. Hastak, PI and D.W. Halpin, Co-PI).
|
JTRP |
14. Manufactured Housing Production Process Planning and Facility Design,
Sept 2002 – Aug 2005 (M. Hastak, PI; Matt Syal, MSU, Co-PI).
|
NSF |
15. NCHRP 20-58(1)/Detailed Planning for Research on Accelerating the Renewal of America’s Highways,
April 2002 – March 2003, National Cooperative Highway Research Program (NCHRP) (Lead Institution: Iowa State University; Purdue Team: Jan Olek, Becky McDaniel, M. Hastak, T. Pellinen, J Weiss, and A. Bobet).
|
NCHRP |
16. Towards a Resilient Grid: A Transformative State-Level Investment Prioritization Decision Framework that Integrates the Growing Risks of Severe Weather-Induced Outages.
|
NSF |
17. Simplified Construction Scheduling for Field Personnel SPR-3907, 2016 (M.Hastak, PI).
|
JTRP |
18. Intelligent Compaction of Asphlat Pavement Implementation SPR-3804 March 2015 (M.Hastak, PI).
|
JTRP |
19. Enhanced Treatment Selectionfor Reflective Joint Cracking in Composite Pavements Phase 2 SPR-3626, 2015 ( M.Hastak, PI).
|
JTRP |